【DO!BOOK・ページリンク】
bearing   288 / 392

BOOKをみる

10秒後にBOOKのページに移動します


■Installation of Shift Tables ■Installing Several Shift Tables on Dual-axis Rails (S Type) ■Installing Several Shift Tables on  a Single-axis Rail (S Type) @Insert the shift tables in the guide rail and adjust the clearance to zero once. @Make sure that two rails are in parallel. (0.2 mm or less) AFasten the mating plate to the shift tables finally, adjust the linear accuracy, and adjust the clearance. CAdjust the clearance on the datum-side shift tables. Parts No. STE20・STC20 STE28・STC28 STFE28・STF28 STF38 STF48 A . . M8×20 M8×25 M10×30 B M8×(T+ 5) M8×(T+ 8) M10×(T+ 8) M10×(T+12) M12×(T+16) The shift table fixing bolts may be used in two ways as shown below. The recommended bolt diameters and lengths are as shown below. BZero the clearance of the datum-side shift tables. Set the clearance of the driven shift tables to 0.3 to 0.5 mm, press the shift tables against the rails in the direction of the arrow, and fix the shift tables to the mating plate finally. Both outer clearances are the same as the amount of clearance adjustment, which depends on the parallelism of the guide rails. AInsert the shift tables into the guide rails with the clearance adjusting sides (    marks) outward. Put the mating plate. Mating plate Datum side Zero clearance Give clearance here. 0.3 to 0.5 mm (Important) Driven side Datum side Driven side A B T Installation and Adjusting Methods of S and SE Types 287Selection Guide Product Air Bearings Metallic Bearing Multi-layer Bearing Plastic Bearing Information Technical Corporate Profi le Information Slide Shifter